Hey, Teststand folks. What's the best way in Teststand 2014 to do this? I'm setting up testing 4 UUTs in parallel using the Batch model. The test sequence has two parts. 2 UUTs at a time can run Part 1. While 2 UUTs are doing the Part 1 test, I want the other 2 UUTs to do the Part 2 test. Then when they're done Part 2, wait for Part 1 slots to become available and then run Part 1. And those UUTs that had run Part 1 first will then run Part 2.
Thanks. -Joe
Joe Czapski
Sonos
Boston, Mass.