hi,
I don't just remember how I can set the step result status to something else that "passed" or "failed". I know I have done that before but now I can't get it work.
Attached simple sequence file to demonstrate what I'm trying. Text report in my machine looks like this:
Begin Sequence: MainSequence
(C:\Temp\status text change test.seq)
Pass/Fail Test: Skipped
Pass/Fail Test: Failed
TEST
Numeric Limit Test: Failed
Measurement: 0
Limits:
Low: 9
High: 11
Comparison Type: GELE (>= <=)
End Sequence: MainSequence
Any hint what is missing ?
br
Petri