Quantcast
Channel: NI TestStand topics
Viewing all articles
Browse latest Browse all 6524

Going from Sequential Model to Parallel Model with a lot of Testcases (how to reduce maintenance efford)

$
0
0

Hi all,

up to now I used the Sequential Model and an wrapper who chooses the test cases and replaces the "dummy Test case" with the correct one to call it later on in a new execution; In the test case (test sequence) I used the Model Options und Report Options callbacks.

Later on 

- a status with more states than passed / failed/terminated should be reported back to the caller to be able to react different

- the test cases should still use the callbacks independent if called by the wrapper or not 

- the parallel Model should be used later on with the socket index 

- a new user Interface needs to be written for that (4 independent test sockets).

 

As the Process Modell defines also the order of the callbacks, I better ask an expert Smiley Happy.

Questions:

how to pass a parameter into a sequence in a new execution, I found 2 possible approaches, one with the callbacks (use process modell) but I need to add a sequence name as additional parameter.....; Are there any other differences between the parallel model and the sequential modell that I need to have in mind?

 

So all these Decisions have an impact on the parameter list so that's why I need to be shure of the optimum approach before I change 180 Testcases (a lot of maintenance work when switching between sequential modell and parrallel model approach Smiley Happy 

  

 

Thanks a lot.

 

Best regards

M. Schreiner


Viewing all articles
Browse latest Browse all 6524

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>